Commissioning Preparation
commissioning preparation required to maintain two types of records1. Commissioning Preparation Check Record
Valves and equipment flow direction correct.
Orifice plates installed check plate tab and its description.
All instruments hooked up.
2. Instrument Installation and Inspection Installation check
a. Check the instrument against the datasheet.
b. Check CE marking.
c. Check calibration certificates.
d. Installation check.
e. Leakage test.
f. Flushing carried out.
Few example checklists:
a. Transmitter Loop Checklist
b. Process Switches Checklist
c. PID Controller Checklist
d. PLC Digital Input Checklist
e. Instrument Installation Checklist
Commissioning Execution
1) Calibration and testing of instruments prior to installation.
2) Visual inspection for complete and correct installation.
3) Insulation and continuity testing of cables.
4) Cleaning, flushing, pressure and leak testing of pneumatic and hydraulic tubing.
5) Adjustment of control, alarm and shutdown settings.
6) Loop testing.
7) Function testing of control systems.
8) Function testing of field instruments.
9) Punch point list for field instruments
10) Area completion.